Summary: as there was concern that this arrangement could lead to potential conflict should there be any problem with the sewage system Thus each house had its own septic tank 41 Drainage 42 channels were constructed to remove surface water and the internal roads were completed 43 Members of the Steering Group were really pleased to receive the
Image Dimensions: 960 x 720
Image originally found here.