Summary: of a break in the weather rise in temperature the blocks were laid on Sat the 6th On the 8th of Jan the blocks were back filled with sand in preparation for the framing All the plumbing that was to go in under the floor was put in during the week of the 8th During the week of the 15th more blocks were hauled in for the animal care center portion of the building